Tag Archives | Industries

Classification of Sampling Plans | Industries

Sampling plans may be classified as follows: 1. Single Sampling Plans 2. Double Sampling Plans 3. Multiple Sampling Plans 4. Sequential Sampling Plan (Item by Item Analysis).   1. Single Sampling Plans: A lot is accepted or rejected on the basis of a single sample drawn from that lot. i. Under this plan, a lot is accepted or rejected on [...]

By |2017-02-06T21:14:02+05:30February 6, 2017|Production Management|Comments Off on Classification of Sampling Plans | Industries

Procedure of Process Planning: 7 Steps | Industries

The different steps involved in process planning are: 1. Preparation of Working Drawing 2. Make or Buy Decision 3. Process Selection 4. Machine Capacity 5. Process and Equipment Selection Procedure 6. Selection of Material, Jigs, etc. 7. Preparation of Documents. Step # 1. Preparation of Working Drawing: A product is depicted by its drawing. A working drawing is a document [...]

By |2017-02-06T21:14:02+05:30February 6, 2017|Process Planning|Comments Off on Procedure of Process Planning: 7 Steps | Industries

Techniques for Statistical Quality Control | Production

This article throws light upon the top fourteen tools and techniques used for statistical quality control. Some of the tools are: 1. Probability Concept 2. The Poisson Distribution 3. Normal Distribution 4. Confidence Limits 5. Measures of Central Tendency 6. Estimation 7. Significance Testing 8. Analysis of Variance 9. Control Charts 10. Life Testing 11. Reliability and Reliability Prediction and [...]

By |2017-02-06T21:14:00+05:30February 6, 2017|Production Management|Comments Off on Techniques for Statistical Quality Control | Production
Go to Top